Optional equipped with lifting cab and extension arm !
| SPECIFICATIONS OF JG100Z GRAPPLE EXCAVATOR | ||||||||||
| RANGE OF OPERATION | Boom length | 3830mm | ||||||||
| Arm length | 1615mm | |||||||||
| Maximum Digging Reach | 7000mm | |||||||||
| Maximum Digging Depth | 4000mm | |||||||||
| Maximum Digging Force | 60KN | |||||||||
| Maximum Digging Height | 6500mm | |||||||||
| Maximum Dumping Height | 4600mm | |||||||||
| Back-end radius of gyration | 1850mm | |||||||||
| DIMENSION | (Length*width*height) travel position | 6450*2200*2950mm | ||||||||
| Wheel base | 2620mm | |||||||||
| Track(Front/rear) | 1930mm | |||||||||
| Ground clearance of counterweight | 1250mm | |||||||||
| Min ground clearance | 230mm | |||||||||
| TECHNICAL PARAMETERS | Angle of rotation | 360° | ||||||||
| Machine weight | 8500kg | |||||||||
| Engine model | YN38GBZ/4102(turbocharged) | |||||||||
| Rated Power | 65KW | |||||||||
| Rated Speed | 2400r/min | |||||||||
| Hydraulic system working pressure | 21Mpa | |||||||||
| Hydraulic system flow | 150L/min | |||||||||
| Variable piston pump | 71ml/r | |||||||||
| Max Hauling force | 58.5KN | |||||||||
| Walking speed | 36km/h | |||||||||
| Grade Climbing ability | 58%/30° | |||||||||
| Tyre model | 825.16 | |||||||||
| Volume Of Bucket | 20Mpa | |||||||||
| Revolution Overdrive Pressure | 5.5s | |||||||||
| Full circle swinging time | 0.35m3 | |||||||||
| Fqt Fuel Quantity | ≥6L/h | |||||||||
| Hydraulic Tank Capacity | 137L | |||||||||
| Capacity Of The Fuel Tank | 109L | |||||||||
| Contact Person : | Mr. Dollar Xu |
|---|