Construction material shops best price vickers 25vq excavator hydraulic pump

1.0 Pieces
MOQ
Construction material shops best price vickers 25vq excavator hydraulic pump
Features Gallery Product Description Request A Quote
Features
Specifications
Condition: New
Applicable Industries: Building Material Shops, Energy & Mining, Machinery Repair Shops, Manufacturing Plant
Showroom Location: Other
Video Outgoing-inspection: Provided
Machinery Test Report: Provided
Marketing Type: New Product 2020
Warranty: 1 Year
After Warranty Service: Online Support, Video Technical Support
Local Service Location: Other
After-sales Service Provided: Free Spare Parts, No After-sales Service, Online Support, Video Technical Support
Basic Infomation
Payment & Shipping Terms
Supply Ability: 5000 Piece/Pieces per Month
Product Description
Installation Application and Maintenance

Operating oil

Anti-wear hydraulic oil is recommended for better performance and longer life. viscosity range: 17-38cst(2.5-5 E)

Proper fluid condition is essential for long and satisfactory life of hydraulic components and systems. filtration: the filtration rating should not be

lower than 25 u m filter of 70-150 um on the inlet port is recommended and its delivery should not be lower than 200% that of pump

Operating temperature: 10-60 C

Installation

Foot and frame for pump must be reliable, solid and good in vibration absorbence

Horizontal mounting is recommended to maintain necessary case fluid level, concentricity of shafts between pump and motor is important to pump life and should be within 0. 1 mm. It is better to use flexible coupling to avoid harmful effects

The oil pump allows the inhalation vacuum as 110 mm column of mercury. Installation should near fuel tank, inhaling the height can not be big in 500 mms

To reduce noise and vibration of system caused by topped air, attachment flange at inlet port, all fittings and piplines must be strictly sealed

The diameter of absorb pipeline should not smaller than that of inlet

There should be a plank in the tank to separate bubble and dirty thing from used oil Return pipeline under oil is recommended(not connect with

inlet) for avoid bubble

Start

 Before starting pump, please check up if the inlet and outlet have been correctly connected and the rotation of the pump is inline with the nameplate. (CW without notice).

 After confirming it is able to work well without burthen, please start.

 When initially starting the pump after long-time unused, removing all trapped air from the system can be accomplished by loosening flange or connections.

Maintenance

 Please inject defend rust oil in the pump, plaint the surface with defend rust grease and then cover ports, if you do not want to use it right now.

 Please check up oil periodically, while if the oil can not meet the demand, replace it and clean up tank.

 Purging of filter regular is recommended

 Keep the normal level of oil in the tank. When capability of tubing and tank are large,even if injected enough oil.Because when starting, the level of oil would fall then please add some oil. Please observe the level of oil and add some oil when needed

 After a period of working, it is likely that the install bolt and flange of inlet and outlet would loose because of vibrating.please tight them.

The cartridge design of V, VQ, SQP, PV2R series vane pumps offers fast and efficent field service ability, when replacing the catridge,seals inside the pump should be cheched to avoid them crimping when tighting the screws, they should be treated with even force in diagonal direction.



Product Details

 The high-pressure and high-performance Intra-vane pumps for Mobile Equipment.

 Features:

 1. To adopt balanced hydraulic for the struction of Intra-vane and ten-Vane design, higher pressure, top to 21MPa

 2. To adopt floating structure for side plate it will do a compensation for end-face clearance by automatic, so that even the pump

 under high pressure it can maintain a high volumetric efficiency.

 3. The side plate is made of dual-metal material, it improved the seizure resistance,and so that the life of pump will be longer

Model Instruction

(F3-) 25VQ 19 A (F)
-1 A 30 R
 Note Series Flow code

 Port connctions

Installation type
 Shaft type  Outlet Positions  Design number  Rotation

 No-marking:Petrolem series oil

 emulsification

 fluid

water

 glycol-fluid

F3:

 phosphate

 ester fluid



20VQ

2、3、4、5、6、7、89、10、11、12、14

 A-SAE

 A-SAE 4- bolt flange


No-marking:Flange Mounting

F:Foot Mounting

1-Str key

151- Spline

 (Viewed from cover

 end of pump)

 A-Opposite inlet

B-90° CCW from inlet

C- Inline with inlet

D-90° CW from inlet

30

 (Viewed form shaft

 end of pump)

L-Left hand for counter clockwise

R-Right hand for clockwise


25VQ

10、12、14、15、17、19、21、25



1-Str key

86- HD Str key

11-Spline

20
35VQ

21、25、30、32、35、38、45

45VQ

42、45、50、57、60、66、75

Flow(USgpm)at1200r/min and0.69mpa

Main Products

Packing And Shipping

Company Profile

Certificate


FAQ

 

Recommended Products
Get in touch with us
Contact Person : Dollar Xu
Characters Remaining(20/3000)